LOP plans loads in real 3D against real dimensions — compare layouts, review calculated load checks and prepare the loading sequence.
LOP plans average 85% fill. Every point of fill you gain is cargo that stops paying for its own empty space. At typical utilization, that’s whole containers back every month.
Typical single-container times: Quick Plan around 2 seconds, Smart Plan around 10 seconds, Maximum Fill around a minute. Times vary with cargo and hardware. The hours a planner spends nudging boxes in a spreadsheet become minutes reviewing a finished 3D plan.
Most planners flatten every part into a box. LOP loads your actual CAD and mesh files (STEP, STL, OBJ, PLY) against true container dimensions, so the plan survives contact with the warehouse floor.
Calculate from the data you enter: payload, center of gravity, stacking loads and separation. Run Validate after an edit to review the current layout. Securing forces and truck axle loads carry their assumptions and model limits.
Your volumes, your rates. See what better fill does to your freight spend.
Estimate based on your inputs and LOP’s average fill rate. Actual savings depend on cargo mix, container types, and route constraints.
Free to try. No credit card required. Your first optimized plan takes minutes.